Gold Line light rail resumes normal service
December 19, 2010 | 4:07
pm
Gold Line trains returned to normal operations at 3 p.m. Sunday after crews repaired a power outage between the Mt. Washington and Pasadena stops.
After Saturday night's outage, trains were forced to share one track and were running about 5 mph between the Del Mar station in Pasadena and the Southwest Museum station in the Mt. Washington neighborhood of Los Angeles.
-- Rong-Gong Lin II and Corina Knoll